1. A-Firestop Pass Through Devices 阻止火災延燃材料
    A-Firestop Sealants 阻止火災延燃密封劑
    AN-RHH or RHW-2 USE-2 XLP
    AN-RHH/RHW-2(EPR/Hypalon)海巴龍外被電線
    AN-SIS-Wire-電線XLP-600V-90度(配電盤用線)
    AN-XHHW-Wire
    回上一頁
  2. 產品搜尋
    分 類:
    關鍵字:  

    首頁 > > A-Firestop Pass Through Devices 阻止火災延燃材料

    EZDP44S  EZ-Path Series 44+ fire-rated device. Device (4 in. x 4 5/8 in. x 14 in.)  通過建物牆壁(電線等)阻火通道裝置
    看原圖
    5704233




    商品編號: A-EZDP44S

    EZDP44S EZ-Path Series 44+ fire-rated device. Device (4 in. x 4 5/8 in. x 14 in.) 通過建物牆壁(電線等)阻火通道裝置





    ★★★★商品說明★★★★

    Series 44+ Pathway Installation Options

    https://www.youtube.com/user/FIRESTOPAUTHORITY

    Designed for new or existing cable installations through walls or floors up to
    12 in. (305 mm) thick. The EZ-Path® Series 44+ pathway holds up to 268+
    CAT 5 cables. For thicker walls, use extension module (Cat No. EZD44ES).

    Install a Single Series 44+ Pathway Through Finished Walls
    Multiple or Ganged Pathway Installations
    Multi-Gang Wall Brackets are designed to allow 1 to 5 Series 44+ Pathways to be installed in finished walls or as the wall is being built.
    Plates attach directly to studs and pathways are installed prior to application of gypsum board. Brackets are suitable for attachment to
    studs spaced up to 24 in. (610 mm).
    Single Wall Plate Kit is designed to allow a single Series 44+ Pathway to be installed in a 6 in. (152 mm) round opening or 4-1/8 in
    (105 mm) x 4-5/8 in (118 mm) opening.

    通過成品牆壁安裝一個單系列44+通路
    多個或夥同安裝路徑
    多崗牆支架的設計,讓1〜5系列44+之路將安裝在牆壁成品或牆正在修建。
    板直接連接到螺栓和途徑是申請前石膏板的安裝。括號內是適合於連接到
    螺柱間距可達24英寸(610毫米)。
    單壁板套件被設計為允許單一系列44+通路被安裝在6英寸(152毫米)的圓形開口或4-1/8
    (105毫米)x4-5/8在(118 mm)開孔。